| Step 1 |
 |
 |
 |
| • |
Small holes are drilled in the existing slab |
|
 |
| Step 2 |
 |
 |
 |
| • |
Concrete leveling equipment hydraulically lifts slab by pumping a limestone / mortar mixture into the holes |
|
 |
| Step 3 |
 |
 |
 |
| • |
Void is filled. Slab is raised, established and ready for immediate use |
|
 |
|
 |
 |
|