The Process and FAQ's

Step 1

process_drillinghole
Small holes are drilled in the existing slab.

Step 2

process_fillingvoid
Concrete leveling equipment hydraulically lifts slab by pumping a cement/limestone mixture into the holes.

Step 3

process_ready
Void is filled. Slab is raised, established and ready for immediate use.

FAQs

What is concrete leveling?

How does it work?

How much does it cost?

What type of material is pumped under the concrete slab?

How does it differ from replacement?

If the concrete is cracked does the process still work?

When will I be able to use?

Do you have a warranty?

How long will it last?

  • Drop files here or